Project Background
The All-American Canal (AAC) is operated and maintained by the Imperial Irrigation District (IID) under a contract with the United States Bureau of Reclamation (USBR). The AAC is currently unlined, resulting in substantial losses to seepage. The All-American Canal Lining Project will result in the concrete lining of 23 miles of the unlined AAC.



